Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Al Shawa, B (2021) Achieving the climate change targets for the global buildings sector: a techno-socioeconomic pathway, Unpublished PhD Thesis, , University of Bath.

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece, Unpublished PhD Thesis, , University of Bath.

Cusack, M M (1981) Time cost models: their use in decision making in the construction industry, with particular reference to the use of the microcomputer, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Du, Q (2009) Integrated decision-making in the cladding supply chain, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

  • Type: Thesis
  • Keywords: communication; complexity; decision making; interview; procurement; questionnaire survey
  • ISBN/ISSN:
  • URL: https://researchportal.bath.ac.uk/en/studentthesis/integrated-decisionmaking-in-the-cladding-supply-chain(914e7c94-531c-40d2-8dda-ac1ffb3711c2).html
  • Abstract:
    The cladding industry is relatively independent and complex, having contemporary features in a rapidly changing sector of the construction industry. The increasing complexity of the cladding procurement and fragmentation of the supply chain bring challenges for making informed decisions. The purpose of this research was to study the cladding design and procurement process, in particular the decision making process. It was hoped to develop an integrated decision making mechanism within the context of the cladding supply chain. Based on preliminary exploration, a conceptual model of integrated communication and decision-making (ICDM) was proposed. Within this model, an Information and Communication (I&C) Hub acts as the pivotal platform of the information supply and communication in the supply chain and is managed by an industry level third party. It provides an effective and secure approach to information exchange and collaborative decision making. A questionnaire survey was the key method of this research, while industry meetings and informal interviews were employed to provide in-depth understanding of the communication related issues in the industry. It was found that the participants of the cladding supply chain were experiencing difficulties of identifying information sources and accessing information, and that an industry level third party acting as an independent information source could be accepted by the cladding industry. Therefore, the I&C Hub gained its necessity and partial feasibility. It was also found that training opportunity for practitioners was limited and the usage of ICT had a large potential for improvement. A number of modifications on the I&C Hub and information flows within the ICDM were proposed to enhance its practicality, and the enhanced model was presented and evaluated by an industry meeting. The conceptual model can only be completely validated by real cases; therefore, this study concluded with a recommendation for testing the framework in future pilot projects.

Dulaimi, M F (1991) Job behaviour of site managers: Its determinants and assessment, Unpublished PhD Thesis, , University of Bath.

Gale, A W (1994) Women in construction: An investigation into some of the aspects of image and knowledge as determinants of the under representation of women in construction management in the British construction industry, Unpublished PhD Thesis, , University of Bath.

Grist, E (2014) The implementation of innovative and sustainable construction materials, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Hampshire, P (2015) The development of an approach and decision support tool to inform sustainable roof selection, Unpublished PhD Thesis, School of Management, University of Bath.

Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model, Unpublished PhD Thesis, Department of Mechanical Engineering, University of Bath.

Hudson, R (2010) Strategies for parametric design in architecture: an application of practice-led research, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Jirojanakul, P (2000) The quality of life of construction workers' children in Bangkok Metropolis, Thailand, Unpublished PhD Thesis, , University of Bath.

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Joyce, S (2016) Performance driven design systems in practice, Unpublished PhD Thesis, , University of Bath.

Kunieda, Y (2017) Development of an impact assessment tool for demolition, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions, Unpublished PhD Thesis, , University of Bath.

Meese, N (2012) Knowledge sharing for sustainable development: a mixed-method study of an international civil engineering consultancy, Unpublished PhD Thesis, , University of Bath.

Mitchell, R (2020) The performance gap in new construction: evaluation of UK Passivhaus dwellings, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Mustapha, F H (1990) Who are the effective construction site managers and what skills do they bring to their work?, Unpublished PhD Thesis, , University of Bath.

Nisbet, P (1995) Dualism, flexibility and self-employment in the UK construction industry, Unpublished PhD Thesis, , University of Bath.

Orr, J (2012) Flexible formwork for concrete structures, Unpublished PhD Thesis, , University of Bath.

Osaily, Y (2021) Guidance for advancing demolition project management in the UK, Unpublished PhD Thesis, , University of Bath.

Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract, Unpublished PhD Thesis, , University of Bath.

Smith, S (2003) Life cycle assessment of civil engineering projects, Unpublished PhD Thesis, , University of Bath.

Voyatzaki, M G (1996) An insight into the design process of unconventional structures, Unpublished PhD Thesis, , University of Bath.

Watson, N (2016) Developing material selection strategies to improve the embodied impacts of buildings, Unpublished PhD Thesis, , University of Bath.

Yin, X (2018) Development of straw bale building in northern China, Unpublished PhD Thesis, , University of Bath.

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.